Complete refurbishment of the condenser park, replacing R404A refrigerant with R448A. Replacement of corroded pipework while continuously maintaining the required temperatures in the cold rooms.
Comprehensive refrigeration system design, installation and maintenance for a greenfield logistics centre (NH₃ – glycol – CO₂). Complete refrigeration system installation as main contractor, from design through to completion.