A complete refurbishment of the condenser installation at a 20-year-old logistics centre is being handed over. As part of the project, the R404A refrigerant, which is increasingly being phased out, was also replaced.

The corroded pipework of the existing refrigeration units was replaced. We successfully met the project’s major challenge: continuously maintaining the required temperatures in the cold rooms while the system was shut down.